Bellevue College Phase 3 Building A &B Mechanical Retrofit

For the Bellevue College Phase 3 project, Johansen Mechanical replaced (42) existing Trane Gas Pack Rooftop units with new High Efficiency Gas Pack units, Rebuilt (32) Rooftop Air Handling units, Performed a complete Retrofit for (5) Air Handling units, Supplied and installed (8)Duct Heaters in individual classrooms, Installed Heat Recovery units for 4 Restroom Exhaust Systems serving 8 individual restrooms.

Our proposal was based on a “Turn-Key” operation complete with Electrical, Low Voltage, Plumbing, and Sprinkler work. JMI was responsible for removing and disposing of the existing equipment including the necessary traffic control measures and plan for vehicles and pedestrians as the college remained open during the duration of the project. Our team organized preconstruction meetings to review the project and preplan crane picks, crew sizes, and subcontractor activities to maximize cost savings and efficiencies. We coordinated our work with the college to minimize shutdowns and relayed our progress and schedule updates on a daily basis.